Round Type Counter Flow Water Cooling Tower

Round Type Counter Flow Water Cooling Tower

Specifications 1.AYD-series cooling tower. 2.high-quality PVC film. 3.low noise. 4.circular cooling water tower. Special features 1. AYD-series cooling tower adopts high-quality PVC film and its honeycombed fan-pattern quietly increases the cold-and-hot alternative capability, stands the high...

Product Details

Round Type Counter Flow Water Cooling Tower Specifications

1.AYD-series cooling tower. 
2.high-quality PVC film. 
3.low noise. 
4.circular cooling water tower.


Special features

1. AYD-series cooling tower adopts high-quality PVC film and its honeycombed fan-pattern quietly increases the cold-and-hot alternative capability, stands the high temperature to 56°C, guarantee that the water tower can reach the best standard. Besides, the tower have in store green film and heat-resisting film(100 centigrade) to be chosen from.

2. The fan is axial-flow one and it’s made of high-quality plastic or aluminum alloy. Each fan had been positioned and balance-tested strictly by professional before it came out of the factory.

3.All the metal main accessories are made of thickened steel by the original factory, have been handled hot-dip galvanizing by ISO and provide with stainless-steel accessories.

4.The casing of the water towers is wholly acid-proof and alkali-resistant advanced glass fiber. All the carrying pipes and sprinklers are made of advanced plastic, need not lubricant and durable.


1. Design Parameter

1. Standard Working Condition: atmospheric pressure P=99400Pa, water inlet temperature t1=37°C, water outlet temperature t2=32°C,design wet-bulb temperature t=28°C, and the real-time temperature difference Δt=5°C.

2. Medium temperature Working Condition: water inlet temperature t1=43°C, water outlet temperature t2=33°C, design wet-bulb temperature τ=28°C, the real-time temperature difference Δt=10°C.

3. High temperature Working Condition: water inlet temperature t1=60°C, water outlet temperature t2=35°C, design wet-bulb temperature τ=28°C, the real-time temperature difference Δt=25°C.


2. Instructions

A . environment choosing

1. To avoid being installed in water-proof gallery or high wall easy to reflect sound and to install it on the roof or open-to-air place.

2. When two or more cooling towers are put to use, pay attention to the interval of the tower bodies.

3. To avoid being installed in place surrounded by walls on all sides or airtight and pay attention to the interval of the tower bodies and the external walls.

4. To avoid being installed where there is soot or much dust so as to prevent the blocking of the film.

5. Keep it away from the warmer places such as the kitchens and boiler rooms.


B. Installment Key Point

1.The foundation should be placed level and the centre line of the cooling tower should be vertical. Otherwise, it will influence the water distribution and the working of the dynamos.

2. For the towers heavier than 175 tons, of which the in-and-out water pipes should be set with supports.

3. When two or more towers share the water pump, a balance water pipe should be added between the basins.

4. The connection of cycling out-and-in water ought to be suspension one.

5. The fan wings of the cooling water should accord with tower wall gaps. In no case will it be allowed that the interval is big. When noticing the condition, people should solve it in time.

6.Motors and reducers need checking at regular intervals. The oil level of reducers should be checked often.


C. Starting Check-up

1. Whether all the screws are frapped and there is sundries inside the tower.

2.Whether the turning of fans and dripping system is smooth.

3. Whether the power voltage is consistent with the motor voltage.

4. Whether the installment of belt combination is right.

5.Open the water inlet valve and fill the basins and water pipes. The water level should be 25mm below the full water.

6. When starting up, open the pump first and then the fan, check the wind direction and air quantity, adjust it immediately until the command is met.

7.When ceasing, cease the fan and then the pump.


D. Running Check-up

1. Keep it clean inside the water tower and conduct the water-conditioning regularly.

2. After running for about 60 hours, it needs checking belt tension to ensure the normal condition.

3. The oil level of the gear reducer should be checked and the lubricant oil needs changing after 150 hours.

4.When the cooling tower is running, people should be in charge of it. Pay constant attention to the change of the electricity and water temperature and conduct regular check-ups for the dynamos, reducers, water distributors and the like.



 MODEL AYD 20T 30T 40T 50T 60T 80T 100T 125T 150T 200T 250T 300T 350T 400T
 Data Water flow m3/h 15.62 23.4 31.21 39.24 46.8 62.64 78.12 97.56 117 156.24 195.12 234 273.24 312.12
Air Volume m3/h 9600 13800 16800 19800 25200 27000 42000 49800 57000 75000 105000 132000 144000 156000
Motor KW 0.56 0.75 1.5 1.5 1.5 1.5 2.25 2.25 2.25 4 5.5 7.5 7.5 11
Sound Volume(16M) dbA 50 51 56.5 57.5 57 59 60 60 60 62 62 62 65 65
Net Weight kg 67 116 130 190 240 260 500 540 580 880 1080 1760 1800 2840
Running weight kg 300 530 550 975 1250 1280 1600 1640 1680 1980 2800 3930 3970 5740
Piping  Water Inlet  W1 50 80 80 80 100 100 125 125 150 150 200 200 200 200
Water outlet W0 50 80 80 80 100 100 125 125 150 150 200 200 200 200
Overflw  OF 25 25 25 25 25 25 25 25 25 40 50 50 50 80
Drain  DR 25 25 25 25 25 25 25 25 25 40 50 50 50 80
Flow Valve  FV 15 15 15 15 20 20 25 25 25 25 25 25 25 32
 Height  Tower  TH 1925 2080 2150 2180 2405 2505 2785 2785 3045 3205 4410 4540 4540 4555
Casing  CH 1180 1275 1325 1335 1350 1450 1620 1620 1880 1970 2300 2400 2400 2255
Air Inlet  AH 175 225 225 225 325 325 325 325 325 365 560 560 560 690
Water Basin  WH 400 400 400 420 460 460 520 520 520 520 900 900 900 900
Water Inlet IH 205 260 260 235 260 260 325 325 325 315 280 280 280 280
Water outlet OH 135 180 180 150 165 165 180 180 180 160 280 280 280 280
Foundation  FH 250 300 300 300 300 300 300 300 300 300 300 300 300 400
 Dia Exhanust Fan ED 770 770 930 930 1180 1180 1470 1470 1470 1780 2135 2440 2440 2745
Water Basin  WD 1180 1665 1665 1895 2110 2110 2920 2920 2920 3320 4200 4730 4730 5600
Foundation  FD 780 1200 1200 1370 1670 1670 2360 2360 2360 2720 4330 4990 4990 5860
Anchor Bolt  BD
Size Foundation  FS 250 300 300 300 300 300 300 300 300 300 300 300 300 400
Bolt Center  BC M10 M10 M12 M12 M12 M12 M12 M12 M12 M14 M14 M14 M14 M16
Material Drive   type Direct 
Fan Ep01 Polycarbonate 
Motor  T.E.F.C.380V/50Hz 
Motor stand Galvanized Steel 
Casing  Fibreglass Reinforced Polyester 
Water Basin  Fibreglass Reinforced Polyester 
Filet system Polycarbonate &   P.V.C.pipe 
Eliminator Fibreglass Reinforced Polyester 
Air inlet stand Polycarbonate &   P.V.C.Mash 
Tower stand Fibreglass Reinforced Polyester 
Ladder  Galvanized Steel 
Pipng  P.V.C.pipe 
Film stand Poly.&G.I.Steel 
In-Fill  P.V.C.Film 

cooling tower storehouse.jpg


cooling tower workshop.jpg

detailes of cooling tower.jpg


square cooling tower.jpg

ANYDA is well acknowledged as one of the leading manufacturers of Round Type Counter Flow Water Cooling Tower in China. All of the products for sale are made in our professional plant. Should you're interested in it, please be free to get the high-tech equipment with competitive price from us.
Previous:50 Ton 60 Hp Plate Heat Exchanger Evaporator Air Cooled Screw Chiller 60HZ Next:Explosion Proof 15 TR Water Cooled Industrial Water Chiller

Inquiry