60TR 90HP Air Cooled Chiller With R410A

60TR 90HP Air Cooled Chiller With R410A

60TR 90HP R410A Air Cooled Chiller Unit Adopt 6 pcs of Danfoss Compressors, with tank and pump inside, 6pcs of big power fan motor. Detailed Specs: Remarks:The cooling capacity is calculated based on 2C evaporating temp, 45C condensing temp. 60TR 90HP Air Cooled Chiller With R410A Compressor...

Chat Now

Product Details

60TR 90HP R410A Air Cooled Chiller Unit  


Adopt 6 pcs of Danfoss Compressors, with tank and pump inside, 6pcs of big power fan motor.


Detailed Specs:


Item

Specification / Supplier

Cooling capacity

Model

AYD-90A

tr/h

60

Power input

kw

5

Temp Outlet   (℃)

5-25adjustable

Power Supply

380V-3N-50HZ

refrigerant control

Expansion   valve

refrigerant

R410A

Dimension(mm)L*W*H

3000*2000*2200

Compressor

style

Hermetic scroll

quantityset

6

Power(kw)

67.8

Condenser

Style

Fin Type

Fan Qty(pcs)

6

Fan Power(kw)

9

Air Volumem3/h

90000

Evaporator

Style

Shell   and tubes

Cold water flowm3/h

40

Pipe sizeDN

80

Tank size(L)

800

Water Pump(kw)

5.5

Protector Device

1.Phase protector

2.Fan overload protector

3.High/low voltage protector

4.Coil overheat protector

5.Anti-freeze protector

Unit Weight(kg

1850

Main  Parts

Compressor

Danfoss

Electronic

LS  /    Carlo

Expansion   Valve

Emerson

Electrical control

Siemens

Remarks:The cooling capacity is calculated based on 2C evaporating temp, 45C condensing temp.


60TR 90HP Air Cooled Chiller With R410A Compressor Details:


15HP

60TR 90HP Air Cooled Chiller With R410A Detailed Image:

chiller control


chiller


90hp chiller


90HP air cooled chiller


90hp air chiller


RFQ:


1. What is production period ?

   Generally speaking, it is 15-30 days,some standard model there are some stocks, but it all depend on the model ,quantity.

2.What is your company after-sales service ?

   Our warranty period is one year. If there is any problem in this year, we will send you the new parts (not including freight )for replacement. Meanwhile, welcome to consulting the technical knowledge.

3.Chiller maintenance?

Step 1: Keep Tubes Clean
Step 2: Ensure a Leak-free Unit
Step 3: Sustain Proper Water Treatment(prevent scale, corrosion)
Step 4: Analyze Oil and Refrigerant


Previous:30KW 0C Glycol Chiller For Milk Cooling Next:70 Tons Water Cooled Industrial Chiller

Inquiry